Land transport

image not found

Land transport is a traditional UMM product. Accumulating experience in complex and voluminous assemblies of port equipment UMM company more and more often received orders for assemblies of metallurgical cranes, cranes for power engineering, chemical industry, etc. Today UMM offers the following types of hoisting equipment: gantry and floating cranes for ports and shipyards, container cranes such as STS, RTG, RMG, bridge cranes, gantry and jib cranes for general and special purposes, as well as non-standard hoisting equipment such as wagon tippers.

Как мы работаем?

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Customer request and solution development

At the stage of the "Terms of Reference" it is worth seeking advice from a specialized organization in order to provide for possible options for the transportation of cargo, the sequence of the project as a whole, to take into account the real conditions for future transportation, to determine the possible timing, to provide for the design features of the transported cargo

Получить консультацию
Customer request and solution development
Customer request

At the first stage, it is necessary to seek advice from the installation organization in order to provide for possible options for loading and unloading operations, the sequence of implementation as a whole, to take into account the real conditions for future work, to determine the possible timing, to provide design features.

Получить консультацию
Customer request
Customer request and solution development

At the stage "Terms of Reference" it is worth seeking advice from the installation organization in order to provide possible options for installation of equipment, the sequence of the project as a whole, to take into account the real conditions for future installation, to determine the possible timing, to provide design features of the purchased equipment.

Получить консультацию
Customer request and solution development
Terms of reference and study of the installation object

In many cases, applications for the installation of certain objects come in a generalized form, respectively, the first thing that makes the expert on installation collects specific information about the object. In some cases, to form an approximate cost of installation, it is enough to get a completed survey, photos (video), instructions of the manufacturer. But to provide a contractual price, specialists need to go to the facility, conduct a visual inspection of installation conditions, study the installation site or its technical documentation, determine what lifting mechanisms will be needed and how to base them on the site, find out what living and working conditions for the team can provide the client. As a result, the specialist together with the client make the terms of reference.

Получить консультацию
Terms of reference and study of the installation object
Terms of reference and study of the object

At the stage of the "Terms of Reference" it is worth seeking advice from the installation organization in order to provide for the sequence of the project as a whole, to take into account the real conditions for future maintenance, to determine the possible timing, to provide for the design features of the equipment.

Получить консультацию
Terms of reference and study of the object
Project preparation

After experts have studied the transported cargo and have concretized the technical project with the client, the Head of the project puts a problem to technologists and designers on working out of a route and Technology on transportation, the Project of manufacturing works (PMW), drawings on technological equipment. Then the Project Manager coordinates with the client the route and, if necessary, cargo transportation technology.

Получить консультацию
Project preparation
Analysis and approval of main terms and conditions

After the specialists have studied the object and specified the terms of reference with the client, the Head of loading and unloading works signs a contract of rent of the truck crane with the client in order to document the rights and obligations of the parties.

Получить консультацию
Analysis and approval of main terms and conditions
Project preparation

After experts have studied the object and have specified the technical project with the client, the Project Manager puts a problem to technologists and designers on working out of Technology on installation, the Project of Manufacturing Works (PMW), drawings on technological equipment. Then the Head of the project co-ordinates with the client PMW and if necessary Technology on object installation.

Получить консультацию
Project preparation
Development and approval of technical documentation for installation

After experts have studied the object and have specified the technical project with the client, the project manager puts a task to technologists and designers on working out of Technology on installation, the Project of manufacturing works (PMW), drawings on technological equipment. Then the Head of the project co-ordinates with the client PMW and if necessary Technology on the installation of an object.

Получить консультацию
Development and approval of technical documentation for installation
Development and approval of technical documentation

After experts have studied object and have specified the technical project with the client, the Head of the project puts a problem to technologists and designers on working out of Technology on service and diagnostics, the Project of manufacturing works (PMW), drawings on technological equipment. Then the Project Manager coordinates PMW with the client and, if necessary, the Technology for installation/dismantling.

Получить консультацию
Development and approval of technical documentation
Freight transportation

When all organizational questions are solved, the team starts transportation of cargo, according to the PMW (the project of manufacturing works) and Transportation Technology

Получить консультацию
Freight transportation
Development and approval of the PMW (the project of manufacturing works)

The Head of loading and unloading operations set a task for technologists and designers to develop the Technology for loading and unloading operations, the Project of manufacturing works (PMW), drawings for technological equipment (as required). Then the Head of works coordinates with the client of the loading and unloading works and, if necessary, the Technology for loading and unloading works.  At the same time with the approval of the PMW, the Head of work solves issues with the manufacture of technological equipment, training of crane operators with slingers and their equipment with the necessary tools, staff protective equipment. After PMW is agreed with the client, the Head of loading and unloading works prepares a site for the future works, checks safety conditions, solves various organizational issues.

Получить консультацию
Development and approval of the PMW (the project of manufacturing works)
Loading to transport

At the same time with the approval of PMW (the project of manufacturing works), the project manager solves the issues with the manufacture of technological equipment, team training, and its equipment with the necessary tools and personal protective equipment. After PMW is coordinated with the client, the project manager prepares an assembly site for work, places the equipment, cabins with the tool, checks safety conditions, solves different organizational questions with finding a team in the client's territory.

Получить консультацию
Loading to transport
Preparation of technological equipment, crew and site

At the same time with the approval of PMW (the project of manufacturing works), the project manager solves the issues with the manufacture of technological equipment, team training, and its equipment with the necessary tools and staff protective equipment. After PMW is coordinated with the client, the project manager prepares an assembly site for work, places the equipment, cabins with the tool, checks safety conditions, solves different organizational questions with finding a team in the client's territory.

Получить консультацию
Preparation of technological equipment, crew and site
Preparation of technological equipment, crew and site

At the same time with the approval of PMW (the project of manufacturing works), the project manager solves the issues with the manufacture of technological equipment, team training, and its equipment with the necessary tools and staff protective equipment. After PMW is coordinated with the client, the project manager prepares an assembly site for work, places the equipment, cabins with the tool, checks safety conditions, solves different organizational questions with finding a team in the client's territory.

Получить консультацию
Preparation of technological equipment, crew and site
Unloading cargo at destination

Upon completion of unloading the cargo is accepted by the customer, after which it is returned to the contractor's base

Получить консультацию
Unloading cargo at destination
Moving from base to object

Transportation of rented special equipment together with the crew from the contractor's base to the client's facility. All processes of the relocation of special equipment are carried out by the contractor.

Получить консультацию
Moving from base to object
Transporting

When all organizational questions are solved, the team starts the installation works, the head of a site places load-lifting mechanisms according to PMW (the project of manufacturing works) and makes necessary cargo operations. In the course of joining of knots, installation of mechanisms and assemblage of metal structures can arise any discrepancies which have been admitted at designing or manufacture, and in such cases the maximum consolidation of efforts of suppliers, assemblers and the client for their settlement is necessary.

Получить консультацию
Transporting
Installation and acceptance tests

When all organizational questions are solved, the team starts the installation works, the head of a site places load-lifting mechanisms according to PMW (the project of manufacturing works) and makes necessary cargo operations. In the course of joining of knots, installation of mechanisms and assemblage of metal structures can arise any discrepancies which have been admitted at designing or manufacture, and in such cases the maximum consolidation of efforts of suppliers, assemblers and the client for their settlement is necessary. On completion of the installation work, adjustments are made, the mechanisms are checked at idle and acceptance tests are carried out.

Получить консультацию
Installation and acceptance tests
Carrying out loading and unloading operations at the facility

When all organizational questions are solved, the crane operator with slingers start loading and unloading works, the head of loading and unloading works places load-lifting mechanisms according to PMW (the project of manufacturing works) and makes necessary cargo operations. After the completion of loading and unloading operations, special equipment is repositioned from the client's facility back to the contractor's base.

Получить консультацию
Carrying out loading and unloading operations at the facility